MaterialsHub
Aluminium, timber & glass

Doors & windowsImported & distributed

Aluminium and timber openings, interior doors, glazing and ironmongery in one specification.

Openings decide how a building performs and how an interior feels. We coordinate aluminium and timber window systems, sliding and pivot doors, interior door sets, glazing specification and ironmongery — thermal performance, opening logic and finish resolved together, then mirrored in the platform so the same schedule drives the quote and the 3D visual.

Importer & distributorLead time 1–2 wks
Slim black aluminium sliding window and tall pivot door in a warm plaster interior
Doors & windowsAluminium, timber & glass
Site survey
Measured before production
One schedule
Drives quote and 0D visual
Performance
U-values stated per opening
Lead time
0–2 wks
New buildsRenovationsHotelsVillasRetail frontagesNew buildsRenovationsHotelsVillasRetail frontagesNew buildsRenovationsHotelsVillasRetail frontages
00 / The brief

A window quoted from a drawing is a price that hasn't been tested yet.

A structural opening is never exactly what the drawing said, and ordering against the drawing rather than a survey is how a 15 mm discrepancy becomes a site-wide problem across forty windows. We measure, number and price every opening individually — frame, glazing and hardware — so the total you approve is the total you're actually invoiced.

Slim black aluminium sliding window and tall pivot door in a warm plaster interior
1–2 wks

Every opening measured, numbered and priced before production — the number you approve doesn't move.

That covers aluminium and timber window systems, lift-and-slide and pivot doors, interior door sets with concealed frames, energy and acoustic glazing, and the ironmongery that finishes them in the same metal family as the brassware and the switch plates.

U-value
Stated per opening
Slim
Minimal sightline systems
Schedule
Measured and numbered
1–2 wks
Hardware and glazing
01 / Why through us

We import the doors & windows. The agent runs the project.

Order windows from drawings instead of a survey and a 15 mm error becomes a site-wide problem. We measure first, then quote.

01 / 04

Priced and surveyed before production starts

Every opening measured, numbered and priced individually, so the number you approve doesn't move once production begins.

Surveyed first, priced once

02 / 04

Performance stated per opening, not per brochure

U-values, air-tightness and acoustic ratings written against each specific window, giving you something to check compliance against.

U-value stated per opening, not per range

03 / 04

One finish family across frames, handles and hinges

Ironmongery coordinated with the lighting and wiring devices already specified, so the visible hardware reads as one decision.

One finish, frame to handle

04 / 04

The schedule you approve is what gets built

The same measured schedule drives the quote and the 3D visual, so there's no gap between what's priced and what's installed.

One schedule drives quote and installation

02 / The range

What we carry in doors & windows

05The rangeLead time 1–2 wks
01

Aluminium systems

Thermally broken casement, tilt-and-turn, lift-and-slide and minimal sliding systems.

  • Keeps heat in and draughts out with thermally broken profiles
  • Performance figures stated up front, so specifications are easy to confirm
  • Slim sightlines let large glazed openings flood a room with light
Indicative supply range
€220–€650 /m²
Casement · tilt-turn · lift-slide
02

Timber & hybrid

Timber and timber-aluminium windows for projects that need warmth inside and durability outside.

  • Warm timber character inside with none of the upkeep outside
  • Aluminium cladding on hybrids shrugs off weather for decades
  • Factory-finished stains and paints arrive ready to install, matched to scheme
Indicative supply range
€220–€650 /m²
Timber · timber-aluminium
03

Interior door sets

Flush, concealed-frame and pivot doors in lacquer and veneer, with matching skirting logic.

  • Flush, concealed-frame and pivot doors for a clean, architectural look
  • Lacquer and veneer finishes matched to the rest of the joinery
  • Skirting and architrave supplied together for a fully coordinated fit
Indicative supply range
€220–€650 /m²
Flush · concealed-frame · pivot
04

Glazing

Double and triple energy glazing, solar control, laminated safety and acoustic units.

  • Solar-control glazing keeps rooms comfortable and cuts energy use
  • Laminated safety glass and acoustic units add security and quiet
  • Coatings specified to suit the building's orientation and climate
Indicative supply range
€220–€650 /m²
Double / triple glazing
05

Ironmongery

Handles, hinges, closers, locks and pivots in matched finishes.

  • Smooth-operating handles, hinges and closers that feel built to last
  • Multipoint locks add real security to every door
  • Finish families matched to lighting and electrical accessories for a coordinated project
Indicative supply range
€220–€650 /m²
Chrome · black · brass
03 / Where it goes

The same material, specified differently per space.

New buildsRenovationsHotelsVillasRetail frontages
Slim-frame sliding glass wall opening a living room onto a terrace

Living spaces & glazing walls

01

Sliding walls with sightlines you can actually get.

The glass wall in the render only exists if the frame system supports the panel weight, the threshold is drained and the structural opening was formed correctly. We check all three before quoting.

  • Lift-and-slide systems with slim interlocks
  • Flush, drained thresholds detailed with the floor
  • Panel weights checked against hardware limits
Apartment facade with dark aluminium window frames and consistent reveal details

Facades & apartments

02

Thermal break, air-tightness, acoustics.

On a facade, performance is contractual. Every opening carries a stated U-value, air permeability class and acoustic rating, and the installation detail — tapes, membranes, insulated reveal — is drawn with it.

  • Polyamide thermal break systems with stated Uw
  • Air-tightness tapes and membranes in the package
  • Acoustic glazing for street-facing elevations
Tall interior door set with concealed frame and matching ironmongery

Interior door sets

03

Concealed frames and floor-to-ceiling leaves.

Interior doors are the most touched item in a building. Concealed or minimal frames, full-height leaves, soft-close hardware and a handle in the same finish family as everything else visible.

  • Concealed frame or minimal-shadow-gap detail
  • Full-height leaves up to 2700 mm
  • Ironmongery matched to brassware and switch plates
Glass shopfront and pivot entrance door in a warm retail interior

Retail & entrances

04

Entrances built for thousands of cycles.

A shopfront door opens hundreds of times a day. Pivot and floor-spring systems, laminated safety glazing, and closers specified for the actual traffic rather than the domestic version of the same look.

  • Floor-spring and pivot systems rated for cycles
  • Laminated safety glass and manifestation
  • Access-compliant thresholds and closers
Aluminium, timber & glass
Aluminium and timber openings, interior doors, glazing and ironmongery in one specification.Aluminium and timber openings, interior doors, glazing and ironmongery in one specification.
04 / How to specify it

The decisions that decide the result.

01 / 05

Ask for Uw, not Ug, before you compare prices

A quote built on the glass figure alone looks better on paper and performs worse on the energy bill, because Ug ignores the frame. Uw is the whole window and the only number that describes what the building actually loses.

02 / 05

Match glazing to orientation before you fix one spec for the building

One glazing spec used on every elevation means overheating rooms on the west and condensation on the north — a comfort complaint that surfaces after the client has moved in. Solar control on south and west, higher solar gain on north, acoustic laminate on the street side.

03 / 05

Decide the opening logic room by room, not from habit

The wrong mechanism in the wrong room means windows that can't be cleaned safely or terraces that can't open wide enough — a defect raised at handover, not a preference. Tilt-and-turn for cleaning and ventilation, sliding for terraces, fixed where nothing needs to open.

04 / 05

Survey before ordering, never quote from the drawing alone

A structural opening is never exactly what the drawing said, and ordering against the drawing turns a 15 mm discrepancy into a site-wide problem across forty windows — remade frames and a stalled programme. Every opening is measured on site and numbered before production.

05 / 05

Specify the installation detail with the window, not after it arrives

A well-made window fitted without tapes, membranes and an insulated reveal fails on air-tightness and draughts within a year, and the fix means reopening finished plaster. The detail is what makes the thermal break real rather than theoretical.

Common mistakes

Ordering from drawings instead of a site survey

A 15 mm discrepancy per opening becomes a site-wide problem across forty windows — remade frames, a delayed install and a disputed invoice.

Leaving out threshold drainage on a flush detail

Water finds the gap in the first storm, and the fix means lifting a finished floor to correct falls that should have been designed in from the start.

Choosing hardware after everything else is ordered

Handle, hinge and closer finishes decided last, and independently of the brassware, leave the building with four different metals visible in one room — a finish complaint that's expensive to correct after installation.

Terms, plainly
Uw
Thermal transmittance of the whole window, frame and glass together.
Thermal break
Polyamide barrier inside an aluminium profile that stops heat bridging.
Lift-and-slide
Sliding system where the leaf lifts off its seals to move, then drops to seal.
05 / Catalog Materials Snapshot

A snapshot of the doors & windows we move most.

Representative selections from the catalog — indicative of what we quote, stock-source and deliver week to week. Ask for the full schedule with formats, finishes and current lead times.

Aluminium systems — Slim black aluminium sliding window and tall pivot door in a warm plaster interior
01

Aluminium systems

Thermally broken casement, tilt-and-turn, lift-and-slide and minimal sliding systems.

Indicative supply range
€220–€650 /m²
Formats
Casement · tilt-turn · lift-slide
Best for
New builds and renovations needing thermal performance
Timber & hybrid — Slim black aluminium sliding window and tall pivot door in a warm plaster interior
02

Timber & hybrid

Timber and timber-aluminium windows for projects that need warmth inside and durability outside.

Indicative supply range
€220–€650 /m²
Formats
Timber · timber-aluminium
Best for
Projects wanting timber warmth with low external maintenance
Interior door sets — Slim black aluminium sliding window and tall pivot door in a warm plaster interior
03

Interior door sets

Flush, concealed-frame and pivot doors in lacquer and veneer, with matching skirting logic.

Indicative supply range
€220–€650 /m²
Formats
Flush · concealed-frame · pivot
Best for
Interior door schemes coordinated with joinery
Glazing — Slim black aluminium sliding window and tall pivot door in a warm plaster interior
04

Glazing

Double and triple energy glazing, solar control, laminated safety and acoustic units.

Indicative supply range
€220–€650 /m²
Formats
Double / triple glazing
Best for
Energy-compliant and acoustic-sensitive glazing
Prefer to give us a call?Call Now +306948408542
06 / The long read

What actually decides
a good doors & windows order.

Order windows from drawings instead of a survey and a 15 mm error becomes a site-wide problem. We measure first, then quote. This is the part most suppliers leave out: what we import, how doors & windows should be specified before anyone prices it, where projects lose money, and what our 1–2 wks lead time actually covers.

01

What we import, and what lands on site

Openings decide how a building performs and how an interior feels. We coordinate aluminium and timber window systems, sliding and pivot doors, interior door sets, glazing specification and ironmongery — thermal performance, opening logic and finish resolved together, then mirrored in the platform so the same schedule drives the quote and the 3D visual.

Because we buy doors & windows directly from the factories, the range you see is the range we can programme — not a catalogue we hope to source later. In practice that means aluminium systems, timber & hybrid and interior door sets, each with its own price band and availability, so a specification can be tuned to a budget instead of abandoned.

Priced and surveyed before production starts: every opening measured, numbered and priced individually, so the number you approve doesn't move once production begins.

Every opening measured, numbered and priced before production — the number you approve doesn't move.

Priced and surveyed before production starts

Every opening measured, numbered and priced individually, so the number you approve doesn't move once production begins.

Performance stated per opening, not per brochure

U-values, air-tightness and acoustic ratings written against each specific window, giving you something to check compliance against.

One finish family across frames, handles and hinges

Ironmongery coordinated with the lighting and wiring devices already specified, so the visible hardware reads as one decision.

The schedule you approve is what gets built

The same measured schedule drives the quote and the 3D visual, so there's no gap between what's priced and what's installed.

02

How doors & windows should be specified before it is priced

Specifying doors & windows well comes down to a short list of decisions taken in the right order — ask for Uw, not Ug, before you compare prices, match glazing to orientation before you fix one spec for the building, decide the opening logic room by room, not from habit and survey before ordering, never quote from the drawing alone. Taken on paper, these cost nothing. Taken on site, each one is a change order.

We write the specification with you before anything is quoted, so the number you get is for the material that will actually be installed. That means confirmed dimensions and finishes, the right performance class for the space, and quantities that include the waste factor rather than discovering it mid-installation.

The same reference behaves differently depending on where it goes — new builds, renovations, hotels and villas each carry their own requirements, and we specify against the space rather than against a mood image.

Uw

Thermal transmittance of the whole window, frame and glass together.

Thermal break

Polyamide barrier inside an aluminium profile that stops heat bridging.

Lift-and-slide

Sliding system where the leaf lifts off its seals to move, then drops to seal.

Rw

Weighted sound reduction index in dB for acoustic glazing.

03

Where doors & windows projects lose time and money

Almost every delay we are called in to rescue traces back to the same handful of causes: ordering from drawings instead of a site survey, leaving out threshold drainage on a flush detail, choosing hardware after everything else is ordered and specifying glazing without checking the wind load zone. None of them are exotic, and all of them are avoidable at specification stage.

Ordering from drawings instead of a site survey is the most expensive one, because a 15 mm discrepancy per opening becomes a site-wide problem across forty windows — remade frames, a delayed install and a disputed invoice.

We have supplied doors & windows into living spaces & glazing walls, facades & apartments and interior door sets, and the pattern is consistent: the projects that run smoothly are the ones where the material was locked before the trades were booked.

Leaving out threshold drainage on a flush detail — checked once on paper, never again on site.

Ordering from drawings instead of a site survey

A 15 mm discrepancy per opening becomes a site-wide problem across forty windows — remade frames, a delayed install and a disputed invoice.

Leaving out threshold drainage on a flush detail

Water finds the gap in the first storm, and the fix means lifting a finished floor to correct falls that should have been designed in from the start.

Choosing hardware after everything else is ordered

Handle, hinge and closer finishes decided last, and independently of the brassware, leave the building with four different metals visible in one room — a finish complaint that's expensive to correct after installation.

Specifying glazing without checking the wind load zone

Coastal and exposed sites need a glazing and frame spec rated for the local wind load, and discovering that after the order is placed means re-engineering the opening, not swapping a pane.

04

Lead times, pricing and what we handle

Standard lead time on doors & windows is 1–2 wks from confirmed specification, and that window covers the whole chain — factory programming, consolidation, transport, customs where applicable and delivery to site or to your warehouse. We quote the landed number, not an ex-works price that grows later.

Pricing is per project rather than per line. Because we import directly and consolidate doors & windows with the rest of the materials for the same room, you get one quote, one delivery window and one point of contact — and the savings show up on the total, not just on a headline reference.

If you already have drawings, send them and we will come back with a specification and a landed price. If you do not, we will build the specification with you first. Either way, nothing is ordered until the quantities, finishes and dates are agreed in writing.

07 / Questions

Frequently asked

How are doors and windows priced?+

Each opening is measured, numbered and priced individually, covering frame, glazing and hardware, then rolled into one schedule with a single total.

Is there a minimum order for window or door systems?+

No fixed minimum; single replacement doors and full building window packages are both surveyed and priced the same way.

Do you survey the openings before quoting?+

For window packages, yes, an opening schedule is measured and confirmed on site before the order is released to production.

What is the lead time from order to installation?+

Standard systems run 1–2 weeks after survey approval; larger or bespoke aluminium runs are confirmed with a production date once the schedule is signed off.

Can I see the opening in 3D before committing to the order?+

Yes, the same schedule that drives the quote can be visualised in 3D so you see the frame colour, glazing and hardware in your actual space.

What U-value do I need for energy compliance?+

Systems are selected against the U-value required for the specific project and documented in the quote, so compliance is confirmed before ordering.

Can you match interior doors to the joinery and ironmongery finish?+

Yes, door sets are specified in the same finish family as the joinery, handles and hinges elsewhere in the project.

Are replacement handles or hinges available later?+

We supply from ranges with ongoing ironmongery availability, so handles, hinges and closers can be replaced without re-specifying the whole door.

Do you supply and deliver openings across Greece and the islands?+

Yes, we work with architects, contractors and private clients nationwide, coordinating delivery with the site's production and installation window.