MaterialsHub
Custom exhibition stand with timber fins, stone counters and warm accent lighting
Product Lines

Trade Show
Design & Development

One team from the floor plan to the last crate off the hall. Stand Design to make the stand impossible to walk past, and Build & On-Site Delivery to build it, ship it, install it and take it down on schedule.

Scroll — the stand builds itself
Custom exhibition stand with timber fins, stone counters and warm accent lighting
01 / Design

Stop them

in the aisle.

Sightlines, headline messaging and product display planned around the way visitors actually walk your hall — approved in 3D before a single panel is cut.

Exhibition crew installing stand walls and truss lighting
02 / Build

Built once.

Shown everywhere.

Joinery, counters, flooring, truss and lighting fabricated in real materials, dry-fitted in the workshop, and crated as a modular kit you can take to the next fair.

Exhibition pavilion with lounge seating and welcome desk at night
03 / Show

Doors open.

You just sell.

Permits, freight, install crew, a technician on call through show days, then dismantle, transport and storage — the whole operation on one schedule and one invoice.

0
Delivery streams
0
Point of contact, design to dismantle
0–10
Weeks, typical stand build
0+
Square metres, largest pavilion
Brief & objectivesConcept & 3DGraphics & messagingJoinery & fabricationLighting, AV & screensPermits & organiserFreight & installationShow support & strikeBrief & objectivesConcept & 3DGraphics & messagingJoinery & fabricationLighting, AV & screensPermits & organiserFreight & installationShow support & strikeBrief & objectivesConcept & 3DGraphics & messagingJoinery & fabricationLighting, AV & screensPermits & organiserFreight & installationShow support & strike
01 / Three streams, one opening bell

Design the stand.
Build it. Run the show.

A trade show is won before the doors open. We design the stand around the conversations you want to have, build it in our workshops, and run installation, show support and dismantle so your team only has to sell.

3D concept visual of an exhibition stand with product display walls and a meeting area
T/01

Stand Design & Presentation

A stand people walk into, not past.

Concept, 3D visuals and traffic-flow design for your hall position — sightlines, headline messaging, product display, demo zones and meeting space planned around visitor flow and your sales targets for the fair.

Concept
Stage
3D + plans
Output
Visitor flow
Focus
On screen
Sign-off
Hall position, sightline and traffic-flow analysis before layout
3D visuals and walkthrough approved before anything is built
Headline messaging, graphics and brand hierarchy on every surface
Product display, demo counters and sample walls sized to your range
Meeting rooms, lounge and storage planned into the footprint
Lighting, AV and screen strategy specified with the design
ONE STAND, ONE CREW, ONE OPENING BELL · ONE STAND, ONE CREW, ONE OPENING BELL ·
ONE STAND, ONE CREW, ONE OPENING BELL · ONE STAND, ONE CREW, ONE OPENING BELL ·
02 / What's included

Everything between the
empty floor and the first visitor.

A single index, drawn and priced before anything is ordered, so the organiser paperwork, the workshop and the sales team are always reading from the same list.

01

Brief & objectives

01 / 08

Fair, hall position, budget and what a successful show looks like in numbers.

02

Concept & 3D

02 / 08

Layout, sightlines and brand presentation approved on screen before build.

03

Graphics & messaging

03 / 08

Headline copy, print artwork and signage hierarchy across every surface.

04

Joinery & fabrication

04 / 08

Walls, counters, display units and storage built in first-hand materials.

05

Lighting, AV & screens

05 / 08

Track lighting, LED walls, monitors and sound specified and rigged.

06

Permits & organiser

06 / 08

Drawings, rigging, power and safety documentation filed on time.

07

Freight & installation

07 / 08

Crating, transport and a crew inside the official build-up window.

08

Show support & strike

08 / 08

On-site technician, dismantle, return transport and storage for next time.

03 / How it runs

From brief
to the opening bell.

The same sequence runs for a 12 m² booth and a 300 m² pavilion. Only the crew size changes — the drawings, the fixed price and the handover record do not.

01

Brief

Fair, stand size, hall position, budget and sales objectives captured.

02

Concept & 3D

Layout, visitor flow and presentation tested in 3D and signed off.

03

Specification & pricing

Materials, graphics, AV and logistics priced in one fixed proposal.

04

Fabrication

Workshop build, print production and full dry assembly before crating.

05

Install

Freight, build-up and commissioning inside the organiser's window.

06

Show & strike

Technician on call, then dismantle, transport and storage for the next fair.

04 / Sourced through MaterialsHub

Every surface,
one supply chain.

Stands are built from the same first-hand ranges as our fit-out work — real stone, timber, tile and lighting, not laminate mock-ups that photograph badly.

05 / The long read

Trade show stands
that pay for the hall.

An exhibition is one of the most expensive square metres a company ever rents. This is how we design, build and run a stand so the spend comes back as meetings, samples handed over and orders signed — not as a nice photo and a pile of crates.

01

The stand starts with the sales target, not the floor plan

Before we draw anything we ask what the fair is supposed to produce: how many qualified conversations, which products must be touched, whether the priority is new distributors, existing clients or press. A stand built to collect fifty distributor meetings looks nothing like a stand built to launch one product to photographers, and the difference is decided in the brief, not in the visuals.

From that we set the ratio of the footprint: how much open frontage pulls people in from the aisle, how much display carries the range, how much closed meeting space you need so a serious buyer can sit down. Every square metre is allocated to a job, and each is priced, so you can see what the lounge or the demo counter is actually costing you before it exists.

A stand is not decoration. It is a sales floor you rent by the square metre for four days.

02

Visitor flow, sightlines and the three-second rule

Visitors decide whether to enter in roughly three seconds, from an angle, while walking. So the design is tested from the aisle first: what is legible at fifteen metres, what pulls at five, and what holds attention once someone is inside. Headline messaging goes high and short, the range goes at eye level, and the technical detail sits where a conversation naturally happens — at the counter.

Hall position drives the layout. A corner stand is opened on two sides, an island is designed with no back, and a stand facing a main entrance gets its strongest surface pointed at the arrival flow. We model it in 3D with your graphics in place, so you approve a stand you can actually walk through rather than a mood board.

Aisle read

Brand and category legible at fifteen metres, in hall lighting.

Entry pull

Open frontage and a reason to step in — product, demo or hospitality.

Range display

Samples at eye level, touchable, with clear specification.

Close the deal

Seated meeting space, storage and a place to sign.

03

Built in real materials, because the camera and the buyer both notice

Stands built from printed foam read as printed foam. Because we import and stock the materials, we build in the real thing: stone and sintered surfaces on counters, timber and veneer on walls, proper tile and vinyl on floors, architectural track lighting rather than hall floods. It photographs better, it survives four days of handling, and it puts your product next to surfaces that support the price you are asking for.

The structure behind those finishes is designed to come apart. Walls, counters and lighting are built as a modular kit with numbered parts, packed into reusable crates, so the second fair costs a fraction of the first and the third only needs new graphics. Every stand is dry-assembled and photographed in the workshop before it ships, which is why installation on the hall floor is a repeat, not an experiment.

First-hand materials, modular structure, dry-fitted before it ever reaches the hall.

04

Permits, freight and the build-up window nobody warns you about

Most exhibition disasters are administrative. Rigging submissions filed late, a stand drawing rejected for height, power ordered at the on-site rate, a truck that misses its unloading slot and waits a day. We handle organiser submissions, structural and electrical documentation, rigging and power orders, freight and customs paperwork, and we book the delivery windows against the official build-up calendar.

On site, our crew installs inside that window and a technician stays reachable through show days for lighting, AV and the small repairs that always happen. After the last visitor, we dismantle, crate and transport the stand back to storage, where it is checked and refreshed ready for your next fair. One contract covers design, build, graphics, logistics, install, show support and strike.

Organiser pack

Drawings, risk assessments, rigging, power and water orders filed on time.

Freight

Crating, transport and customs paperwork for Greek and European halls.

Install

Crew scheduled inside the official build-up period, commissioning included.

Strike & store

Dismantle, return transport, warehouse storage and refresh between fairs.

05

One programme, connected to everything else we build

Trade show work runs on the same supply chain and the same project discipline as our retail, hospitality and office programmes. The joinery workshop that builds a store counter builds your display counter; the lighting we specify for a showroom lights your samples; the materials on the stand are the same ranges we import and stock all year.

That matters for the companies we mostly work with — manufacturers, importers and studios exhibiting a physical product. Your stand can be a working extract of your showroom, using stock you already sell, with a specification you can hand to a client on the spot. If the fair produces the orders you planned for, the same team can carry the work into a permanent showroom or a retail rollout without starting the relationship again.

06 / Frequently asked

Trade show stands, answered.

Do you handle the organiser paperwork and permits?+

Yes. Stand drawings, structural and rigging submissions, power and water orders, risk assessments and build-up passes are prepared and filed by us against each organiser's deadlines, so nothing is refused at the door.

How early do we need to start before the fair?+

Four to ten weeks is typical, depending on stand size and whether custom joinery, LED walls or double-deck structures are involved. If you are closer to the date, tell us the fair and we will say honestly what can still be delivered.

Can the stand be reused at other fairs?+

Yes. We design a modular core — walls, counters and lighting that pack into reusable crates — with graphics and layout adapted per fair. That usually cuts the cost of the second and third show substantially.

Do you install and dismantle, or only build?+

Both. Our crew installs inside the official build-up period, a technician is on call during show days for lighting, AV and repairs, and we dismantle, crate and store the stand after the last visitor leaves.

Can you work at fairs outside Greece?+

Yes. We build in our workshops, handle freight and customs paperwork, and work with vetted local crews at halls across Europe, so the same stand opens the same way in Athens, Milan or Frankfurt.

Is the price fixed before production starts?+

Yes. Once the 3D and specification are approved you receive one fixed proposal covering design, fabrication, graphics, AV, freight, installation and dismantle, with a costed process for anything added later.

Send us the fair.
We'll send back the stand.

Tell us the exhibition, your stand size and hall position, the products you need to show and the date. You will get a 3D concept, a fixed price covering build, graphics, logistics and dismantle, and a schedule that ends with your team selling instead of unpacking.

Prefer to give us a call? +30 6948 408 542