Bathroom renovation across Greece — a small apartment bathroom in Athens, a family bathroom in Thessaloniki, a villa or rental on the islands. Wet-Room Engineering to get the layout, waterproofing and drains right under the tiles, and Supply & Fit to supply and fit tiles, sanitaryware and furniture on a fixed price and programme.

3
Streams: waterproof, tile, fit
24 h
Flood test before any tile
7
Steps, survey to handover
1
Contract and point of contact
◆Survey & layout◆Waterproofing & falls◆First-fix M&E◆Tiling & stone◆Sanitaryware◆Furniture & mirrors◆Lighting & ventilation◆Snagging & handover◆Survey & layout◆Waterproofing & falls◆First-fix M&E◆Tiling & stone◆Sanitaryware◆Furniture & mirrors◆Lighting & ventilation◆Snagging & handover◆Survey & layout◆Waterproofing & falls◆First-fix M&E◆Tiling & stone◆Sanitaryware◆Furniture & mirrors◆Lighting & ventilation◆Snagging & handover
01 / Three streams, one delivery

Waterproof it.
Tile it. Furnish it.

Choose one stream or all three under a single contract — for your own home, a holiday house or a run of rental and hotel bathrooms. Waterproofing falls, tile setting-out and furniture positions are drawn from the same file, so pipe centres and fixture heights never get re-measured on site.

Waterproofing membrane and tanking being applied to a bathroom floor before tiling
B/01

Wet-Room Engineering

The membrane and the fall that make a bathroom actually work.

Drainage falls, tanking membranes, underfloor heating and first-fix plumbing set out before a single tile is laid — so the shower drains properly and the wall behind it never sees a leak.

First fix
Stage
Tanking + falls
Output
Zero leaks
Focus
Flood test
Sign-off
Fixture and drainage layout tested against real pipe centres, not a generic template
Full tanking system to walls and floor, taped and sealed at every junction
Shower and wet-room floor falls set for positive drainage to the gully
Underfloor heating loops laid and pressure-tested before screed
First-fix plumbing and electrical containment coordinated with the tile setting-out
Flood test and photographic record before any finish goes down
Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted.
Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted. Waterproofed. Set out. Fitted.
02 / What's included

Everything between
the drain and the mirror.

A bathroom renovation runs to a fixed scope so quotes are comparable and nothing is assumed. This is what sits inside every job, whether it is one apartment bathroom or every bathroom in a guesthouse.

01

Survey & layout

01 / 08

Existing drainage, structure and services surveyed before any layout is fixed.

02

Waterproofing & falls

02 / 08

Full tanking system and drainage falls to every wet zone, flood tested.

03

First-fix M&E

03 / 08

Plumbing, electrical containment and underfloor heating coordinated with tiling.

04

Tiling & stone

04 / 08

Porcelain, marble and mosaic supplied and fitted to a checked setting-out drawing.

05

Sanitaryware

05 / 08

Basins, WCs, showers and baths from first-hand branded ranges, fitted and tested.

06

Furniture & mirrors

06 / 08

Vanity units, storage and backlit mirrors sized to the room and installed.

07

Lighting & ventilation

07 / 08

IP-rated lighting circuits and extraction sized to the room volume.

08

Snagging & handover

08 / 08

Room-by-room snag list, sealant record and warranty documentation.

03 / How it runs

From strip-out
to the last snag.

The same sequence whether it's one bathroom or a floor of them: survey, drawings, strip-out, first fix, tiling, fit-out, sign-off.

01

Survey

Existing drainage, structure and services measured and photographed on site.

02

Layout & setting-out

Fixture positions, tile grid and pipe centres drawn and approved before ordering.

03

Strip-out

Existing fixtures, tiling and linings removed and disposed of.

04

Waterproofing & first fix

Tanking, falls, underfloor heating and containment installed and tested.

05

Tiling

Porcelain, stone and mosaic set out and fixed to the approved drawing.

06

Sanitaryware & furniture fit

Basins, showers, vanities and lighting installed and commissioned.

07

Snagging & handover

Room-by-room inspection, sealant record and warranty pack issued.

04 / Sourced through MaterialsHub

Every surface,
one supply chain.

Bathroom renovation draws on the same ranges as the rest of the site — first-hand stock, one warranty trail, one delivery schedule, shipped to the mainland or the islands.

05 / The long read

What a bathroom renovation
in Greece actually involves.

A bathroom is the smallest room in most Greek homes and the most expensive per square metre to get wrong. This is the full path from strip-out to handover, written the way we run it.

01

Waterproofing decides the lifespan, not the tile

Most bathroom failures in Greek apartment buildings trace back to one decision made in the first two days of the job: how the wet zones were tanked before tiling. A tile finish can look identical whether the membrane underneath is continuous and taped at every junction, or patchy and reliant on grout to keep water out. The difference only shows up eighteen months later, in the ceiling of the flat below.

We tank every wet zone as a continuous system — floor, upstands and shower walls to at least 1.8 metres — with taped corners, pipe collars sealed at penetration points, and a flood test held for a minimum of 24 hours before any tile is fixed. This is documented with photographs and a signed record, because it is the one part of the job you cannot inspect once the room is finished.

Everything above the membrane is decoration. Everything in the membrane is the actual bathroom.

02

Setting-out: where the cuts land matters more than the tile

The same porcelain tile can look premium or cheap depending entirely on where the cut pieces fall. A setting-out drawing maps every wall, floor and niche before ordering, so full tiles land at eye level and on the leading edge of any feature wall, and narrow off-cuts are pushed to corners, behind doors or under the vanity where they are never seen.

This matters more in bathrooms than any other room because the space is small and every surface is close to the eye. A 20cm miscalculation in a living room floor is invisible; the same miscalculation in a 1.4-metre-wide shower recess is the first thing anyone notices.

03

Fixture heights and pipe centres, fixed before the walls are finished

Sanitaryware manufacturers publish exact rough-in dimensions — the position of the water supply, waste outlet and, for wall-hung units, the frame fixing centres. These have to be fixed before tiling, because moving a waste outlet after the floor is finished means breaking tile to get to it.

We cross-check every rough-in dimension against the selected sanitaryware model before first fix, not against a generic assumption of where a WC or basin usually sits. It is a small piece of coordination that prevents the single most common and expensive bathroom snag: a fixture that doesn't align with its own pipework.

WC frame

Fixing centres and cistern access checked against the exact model before wall build-up.

Basin waste

Height and offset confirmed against the vanity or countertop basin selected, not a standard height.

Shower drain

Position and fall confirmed against the shower tray or wet-room gully dimensions.

Towel rail circuit

Electrical position agreed before first fix so it isn't retrofitted through finished tile.

04

Ventilation and heating, sized to the room, not assumed

A bathroom with no mechanical extraction, or an extraction fan sized for a room half the volume, will grow mould behind furniture within a year regardless of tile quality. Extraction rate is calculated from room volume and air changes per hour required for a wet room, then specified as a fan model with that stated performance — not a generic fan bought because it fits the ceiling hole.

Underfloor heating is increasingly standard in Greek bathroom renovations, both for comfort and because it dries the floor faster after use, reducing standing moisture. It is designed as a wet system laid into the screed with its own thermostat zone, tested under pressure before the floor is finished, and never retrofitted as an afterthought once tiling is underway.

05

Small city bathrooms, island rentals and hotel rooms

Most Greek apartment bathrooms are small, and the fixed points are the building's drain stack and, often, a water heater on the wall. The biggest gains come from layout rather than finishes: a wall-hung WC on a concealed frame, a level walk-in shower with a fixed glass panel instead of a bath, a shallow vanity and large-format tiles with fewer grout lines. Each of these depends on the survey — floor build-up for the shower fall, wall depth for the frame — which is why nothing is promised before it.

On the islands the conditions change. Sea air corrodes ordinary chrome and cheap brass, so fittings are chosen for it; hard water marks glass and dark surfaces, so screens get easy-clean treatment and finishes are chosen to hide limescale. Rental and hotel bathrooms are drawn once and repeated room by room, materials are shipped in as few loads as possible, and the work runs between autumn and spring so the property opens for the season.

06 / Frequently asked

Bathroom renovation in Greece, answered.

What sets the cost of a bathroom renovation?+

Five things, more than the floor area: whether the old supply pipes and drains are replaced (in older Greek apartment buildings they usually should be), whether the WC or shower moves away from the existing drain, a bath turned into a level walk-in shower, the tile format and stone, and the grade of sanitaryware and furniture. Access counts too — a fifth floor with no lift, or materials shipped to an island. Each is a separate line in our quote, so you can see what moves the number.

How long does a bathroom renovation take?+

For a standard apartment bathroom, typically two to three working weeks on site, provided the layout, tiles and sanitaryware are chosen before strip-out. The waterproofing has to cure and pass its flood test before tiling, and that wait is built into the programme rather than skipped.

Why does waterproofing under the tiles matter so much?+

Because tiles and grout are not waterproof. In a Greek apartment building a leak shows up in the neighbour's ceiling below, often a year or more later. Every wet zone is tanked as one continuous membrane — floor, upstands and shower walls — taped at the corners and pipe collars, then flood tested for at least 24 hours and photographed before any tile goes down.

Can a small bathroom take a walk-in shower?+

Usually, yes — it often makes a small bathroom feel larger than a tray or a bath. A level-access shower needs a fall in the floor to a linear or point drain, so the survey checks the floor build-up and the route to the building's drain stack before we promise one. A fixed glass panel instead of a cabin keeps the room open.

Do I need a permit to renovate a bathroom?+

A renovation that replaces finishes and fittings without touching the structure or the façade generally needs no building permit. New electrical work is done to ΕΛΟΤ HD 384 bathroom zones and certified by a licensed electrician with a Υπεύθυνη Δήλωση Εγκαταστάτη (ΥΔΕ). In an apartment building we also agree working hours and access with the building manager.

Do you renovate bathrooms in hotels and rentals on the islands?+

Yes. Island hotel and rental bathrooms are scheduled between autumn and spring so they reopen for the season, with materials shipped in as few loads as possible. Sea air and hard water shape the specification: corrosion-resistant fittings and easy-clean glass and surfaces. Several identical bathrooms are drawn once and repeated.

Can I use my own tiler or plumber?+

Yes. The full supply-and-fit package is the simplest route, but the waterproofing and tiling drawings and the sanitaryware order can also be handed to your own trades.

I own a property in Greece but live abroad. Can you manage the renovation?+

Yes. You approve the layout, tiles and fittings on screen, the waterproofing and flood test are photographed, and the bathroom is handed over with its documents whether or not you are in the country.

Start your
bathroom renovation.

Send us a floor plan or a few photos of the existing bathroom, wherever it is in Greece. We'll come back with a setting-out drawing, a fixed price and a start date.