MaterialsHub
Product Lines

HoReCa Fit-Out

One contract from the first cover count to opening night service. Kitchen & Compliance to get the kitchen and the licence right, and Front-of-House Build to build the room your guests actually sit in.

01 / The room
The dining room guests choose to sit in.
0
Delivery streams
0
Point of contact, kitchen to dining room
0–14
Weeks, typical unit build
0+
Units, multi-site rollouts
Concept & layoutCommercial kitchenFront-of-house buildM&E & ventilationLighting & acousticsLicensing & complianceBranding & signageCommissioning & handoverConcept & layoutCommercial kitchenFront-of-house buildM&E & ventilationLighting & acousticsLicensing & complianceBranding & signageCommissioning & handoverConcept & layoutCommercial kitchenFront-of-house buildM&E & ventilationLighting & acousticsLicensing & complianceBranding & signageCommissioning & handover
01 / Three streams, one opening date

Build the kitchen.
Build the room. Open on time.

A restaurant, café or bar succeeds or fails on the same three things every time — a kitchen that passes inspection, a room guests want to sit in, and a brand rollout that looks identical on unit one and unit twenty.

Stainless steel commercial kitchen cook line with extraction hoods and hygienic wall panels
R/01

Kitchen & Back-of-House

Built to pass inspection on the first visit.

Cook line, wash-up, cold storage and stewarding designed around your menu and covers, finished in hygienic, hard-wearing materials and equipped with direct-sourced catering machinery under manufacturer warranty.

BOH
Stage
HACCP-ready
Standard
Direct sourced
Equipment
Inspection-ready
Sign-off
Cook line, cold storage and wash-up layout sized to menu and covers
Extraction, ventilation and grease-trap design to code
Hygienic stainless steel, epoxy flooring and wall protection
Catering equipment sourced direct from manufacturers with warranty
Utilities and gas coordination with base-build and licensing authority
Documentation pack ready for health and safety inspection
ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE · ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE ·
ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE · ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE ·
02 / What's included

Everything between the
shell and first service.

A single index, priced and drawn before anything is ordered, so the concept, the licence application and the site programme are always reading from the same list.

01

Concept & layout

01 / 08

Cover count, service flow and kitchen-to-room adjacency modelled first.

02

Commercial kitchen

02 / 08

Cook line, wash-up, cold storage and hygienic finishes, equipped and warranted.

03

Front-of-house build

03 / 08

Dining room, bar and terrace joinery, seating and flooring.

04

M&E & ventilation

04 / 08

Extraction, gas, power and HVAC sized to the kitchen and cover count.

05

Lighting & acoustics

05 / 08

Ambient and feature lighting, acoustic treatment for service comfort.

06

Licensing & compliance

06 / 08

Documentation and finishes aligned with health, safety and permit requirements.

07

Branding & signage

07 / 08

Façade, signage and interior branding matched to the concept.

08

Commissioning & handover

08 / 08

Equipment testing, snagging and a signed handover before opening.

03 / How it runs

From brief
to opening night.

The same sequence runs for a single café and a fifty-unit rollout. Only the number of units changes — the kitchen standard, the pricing and the handover record do not.

01

Brief

Concept, menu, cover count and target opening date captured.

02

Concept & layout

Kitchen adjacency, dining layout and service flow tested against the brief.

03

Specification & pricing

Materials, equipment and finishes specified with a fixed-price proposal.

04

Production & procurement

Joinery, equipment and long-lead materials ordered against the approved file.

05

Fit-out & installation

Kitchen, front-of-house and M&E installed to a fixed site programme.

06

Handover & opening

Commissioning, inspection readiness, snagging and signed handover.

04 / Sourced through MaterialsHub

Every surface,
one supply chain.

HoReCa design draws on the same ranges as the rest of the site — first-hand stock, one warranty trail, one delivery schedule across every unit in a rollout.

05 / The long read

What HoReCa fit-out
actually involves.

A restaurant, café or bar is judged twice: once by the health inspector who never sees the dining room, and once by the guest who never sees the kitchen. This is how we build both sides of that judgement, from the first cover count to the first table turn.

01

Start with covers, not the floor plan

Every HoReCa fit-out that struggles at opening struggles for the same reason: the dining room was drawn before anyone modelled how many covers the kitchen could actually support, at what turn time, during a Friday dinner service. We start with a covers model — seat count, expected turn time, peak-hour throughput and menu complexity — because that model sizes the kitchen, not the other way round.

A kitchen built for forty covers on a simple grill menu looks nothing like one built for forty covers on a multi-station à la carte concept. Getting the covers model right before a single wall is drawn is the difference between a kitchen that can run a full house and one that buckles on a Saturday.

Size the kitchen from the covers model, not the dining room drawing. The kitchen decides how many covers the room can actually serve.

02

The kitchen is a compliance document as much as a room

A commercial kitchen has to satisfy a menu, a health inspector and a stream of daily deliveries at the same time. Cook line, wash-up and cold storage are laid out to keep raw and cooked flows separated, hygienic wall and floor finishes are specified to code, and extraction is sized to the grill, fryer and wok load the menu actually requires — not a generic allowance.

We prepare the documentation pack for the pre-opening health and safety inspection alongside the construction drawings, because a kitchen that looks right and a kitchen that passes inspection are not automatically the same thing, and the gap between them is expensive to close after the fact.

Cook line

Sized to menu complexity and peak-hour throughput, not floor area alone.

Extraction

Matched to actual grill, fryer and wok load rather than a generic allowance.

Hygienic finishes

Stainless, epoxy and sealed surfaces specified to code from the start.

Documentation

Inspection-ready pack prepared alongside construction drawings.

03

The dining room is a revenue instrument

Seating layout, table spacing and lighting are not decoration decisions — they set the number of covers a room can turn per service and how long a guest is comfortable staying. A room built too tight kills the guest experience; a room built too loose leaves covers on the table every night the restaurant is full.

We model the dining room against the covers and turn-time targets set at brief stage, then choose materials that survive daily commercial service — sealed flooring, wipeable upholstery, and lighting that flatters food and faces without overheating a packed room on a summer night.

04

Multi-site rollout is a specification discipline

A single restaurant tolerates individual decisions. A brand with five or fifty locations cannot — a guest who visits three branches expects the same counter, the same lighting and the same menu board in each one. We build one reference unit, lock every material and equipment decision against it in a specification pack, and price every subsequent unit against that same pack.

The discipline that makes a rollout work is refusing site-by-site improvisation: where a unit's shell differs from the reference — a lower ceiling, an awkward column, a smaller frontage — the specification is adapted on paper before construction starts, not solved on site by a foreman making a judgement call.

A rollout succeeds by refusing improvisation. Every deviation from the reference unit is solved on paper, before it becomes a site decision.

05

Licensing, permits and the opening date

In Greece, a food-service unit typically needs a health licence, a fire safety certificate and, for units with music or extended hours, a noise and operating permit — each with its own documentation and inspection sequence. Leaving licensing until construction is finished routinely adds weeks to an opening date that was already fixed with a landlord or franchisor.

We sequence licensing documentation in parallel with construction, using the same drawings and specification that go into the build, so the inspection walk-through and the fit-out reach completion together rather than one waiting on the other.

06 / Frequently asked

HoReCa fit-out, answered.

Can you handle kitchen, front-of-house and licensing together?+

Yes. Kitchen & Back-of-House, Front-of-House & Bar and licensing documentation are run from one project team, so the kitchen layout, the dining room and the permit application are designed to agree with each other from day one.

How long does a typical restaurant or café fit-out take?+

A standard single-unit fit-out typically runs six to fourteen weeks from signed specification to handover, depending on kitchen complexity, seating count and whether structural or façade works are required.

Is the kitchen designed to pass health and safety inspection?+

Yes. Layout, extraction, hygienic finishes and equipment are specified against HACCP and local health authority requirements, with a documentation pack prepared ahead of the pre-opening inspection.

Can you deliver a multi-site rollout with consistent quality?+

Yes. We build one signed reference unit, lock a specification pack against it, and repeat that build to a fixed per-unit price across five, twenty or fifty locations.

Do you source the kitchen equipment as well as build the space?+

Yes. Catering equipment is sourced directly from manufacturers with full warranty pass-through and installed as part of the same programme as the kitchen fit-out.

Is the price fixed before construction starts?+

Yes. Once the specification is signed off, you receive a fixed-price proposal with a costed variations process for anything added once works are underway.

Can you work around an existing lease fit-out or shell condition?+

Yes. We survey the shell, existing services and structural constraints before finalising layout, so the kitchen and dining room design works with what the unit already has, not against it.

Send Us The Concept.
We will send back a working kitchen.

One restaurant or a fifty-unit rollout — tell us the concept, the covers and the opening date. You get a kitchen designed to pass inspection, a dining room built for service, and a fixed-price specification for every stream.

Prefer to give us a call? +30 6948 408 542