MaterialsHub
Product Lines

Restaurant & Bar Fit-Out

Restaurant, café and bar fit-out across Greece, from the first cover count to opening night. Kitchen & Compliance to get the kitchen, the extraction and the licensing file right, and Front-of-House Build to build the room your guests actually sit in.

01 / The room
The dining room guests choose to sit in.
3
Streams: kitchen, dining room, rollout
1
Point of contact, kitchen to dining room
8
Scope items in one priced index
6
Stages, brief to opening night
◆Survey & layout◆Commercial kitchen◆Dining room & bar◆Extraction & services◆Lighting & acoustics◆Licensing documentation◆Shopfront & signage◆Commissioning & handover◆Survey & layout◆Commercial kitchen◆Dining room & bar◆Extraction & services◆Lighting & acoustics◆Licensing documentation◆Shopfront & signage◆Commissioning & handover◆Survey & layout◆Commercial kitchen◆Dining room & bar◆Extraction & services◆Lighting & acoustics◆Licensing documentation◆Shopfront & signage◆Commissioning & handover
01 / Three streams, one opening date

Build the kitchen.
Build the room. Open on time.

A restaurant, café or bar in Greece succeeds or fails on the same three things: a kitchen that passes the health inspection and can actually vent its smoke, a room guests want to sit in on a summer night, and, for a brand, a second unit that looks exactly like the first.

Stainless steel commercial kitchen cook line with extraction hoods and hygienic wall panels
R/01

Kitchen & Back-of-House

Built to pass inspection on the first visit.

Cook line, wash-up, cold storage and dry store designed around your menu and covers, finished in hygienic, hard-wearing materials and equipped with catering machinery sourced direct under manufacturer warranty.

Back-of-house
Stage
HACCP-ready
Standard
Direct sourced
Equipment
Inspection-ready
Sign-off
Cook line, cold storage and wash-up layout sized to menu and covers
Extraction route and discharge planned first, up to the roof where the building requires it
Hygienic stainless steel, resin or tiled floors with coved skirtings
Catering equipment sourced direct from manufacturers with warranty
Gas, power and water coordinated with the building and your engineer
Drawings and specifications ready for the health-licensing file
ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE · ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE ·
ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE · ONE KITCHEN, ONE DINING ROOM, ONE OPENING DATE ·
02 / What's included

Everything between the
shell and first service.

A single index, priced and drawn before anything is ordered, so the concept, the licensing file and the site programme read from the same list.

01

Survey & layout

01 / 08

Shell, services and extraction route checked; covers and service flow modelled first.

02

Commercial kitchen

02 / 08

Cook line, wash-up, cold storage and hygienic finishes, equipped and warranted.

03

Dining room & bar

03 / 08

Joinery, counters, seating and flooring for dining room, bar and terrace.

04

Extraction & services

04 / 08

Extraction, gas, power and air conditioning sized to the kitchen and the room.

05

Lighting & acoustics

05 / 08

Ambient and feature lighting, acoustic treatment so a full room stays comfortable.

06

Licensing documentation

06 / 08

Drawings and specifications for the health, fire-safety and music-permit files.

07

Shopfront & signage

07 / 08

Façade, signage and interior branding matched to the concept.

08

Commissioning & handover

08 / 08

Equipment testing, snagging and a signed handover before opening.

03 / How it runs

From brief
to opening night.

The same sequence runs for a single café and a brand with several units. Only the number of units changes; the kitchen standard, the pricing and the handover record do not.

01

Brief & survey

Concept, menu, covers and opening date; shell, extraction route and services checked.

02

Concept & layout

Kitchen adjacency, dining layout and service flow tested against the brief.

03

Specification & pricing

Materials, equipment and finishes specified with a fixed-price proposal.

04

Ordering & production

Joinery, equipment and long-lead materials ordered against the approved file.

05

Fit-out & installation

Kitchen, dining room and services installed to a fixed site programme.

06

Handover & opening

Commissioning, inspection readiness, snagging and signed handover.

04 / Sourced through MaterialsHub

Every surface,
one supply chain.

Restaurant and bar fit-out draws on the same ranges as the rest of the site: first-hand stock, one warranty trail, one delivery schedule for every unit.

05 / The long read

What restaurant and bar fit-out
actually involves.

A restaurant, café or bar is judged twice: once by the health inspector who never sees the dining room, and once by the guest who never sees the kitchen. This is how we build both sides of that judgement in Greece, from the first cover count to the first table turn.

01

Start with covers, not the floor plan

Every restaurant fit-out that struggles at opening struggles for the same reason: the dining room was drawn before anyone worked out how many covers the kitchen could support, at what turn time, on a Saturday night in August. We start with a covers model — seat count, expected turn time, peak-hour throughput and menu complexity — because that model sizes the kitchen, not the other way round.

A kitchen built for forty covers on a simple grill menu looks nothing like one built for forty covers on a multi-station à la carte concept. Getting the covers model right before a wall is drawn is the difference between a kitchen that can run a full house and one that buckles on the busiest night of the year.

Size the kitchen from the covers model, not the dining room drawing. The kitchen decides how many covers the room can actually serve.

02

Extraction decides whether the unit can be a restaurant at all

The most expensive surprise in a Greek restaurant fit-out is not the equipment; it is the smoke. Kitchen extraction has to be routed and discharged the way the building and the municipality require, which in an apartment block often means a duct taken up to the roof. A unit with no route for that duct cannot host a real kitchen, however good the lease looks.

So the extraction route is the first thing we check in the survey, before layout and before pricing. From there the cook line, wash-up and cold storage are laid out to keep raw and cooked flows apart, finishes are specified for hygiene, and the extraction is sized to the grill, fryer and oven load the menu actually needs.

Extraction route

Checked first: where the duct runs and where it discharges.

Cook line

Sized to menu complexity and peak-hour throughput, not floor area alone.

Hygienic finishes

Stainless, resin or tiled floors and sealed surfaces from the start.

Documentation

Drawings for the licensing file prepared alongside construction drawings.

03

The dining room is a revenue instrument

Seating layout, table spacing and lighting are not decoration decisions: they set how many covers a room can turn per service and how long a guest is comfortable staying. A room built too tight kills the experience; a room built too loose leaves covers on the table every night the restaurant is full.

In Greece half the year's covers are often outdoors, so the terrace is designed with the room, not after it: a layout that fits the municipal pavement permit, shade, furniture that survives sun and wind, and lighting that works after dark. Indoors we choose sealed flooring, wipeable upholstery and lighting that flatters food without overheating a packed room in July.

04

A multi-site rollout is a specification discipline

A single restaurant tolerates individual decisions. A brand with several locations cannot: a guest who visits three branches expects the same counter, the same lighting and the same menu board in each. We build one reference unit, lock every material and equipment decision in a specification pack, and price every following unit against that pack.

What makes a rollout work is refusing site-by-site improvisation. Where a unit's shell differs from the reference — a lower ceiling, an awkward column, a narrower frontage — the specification is adapted on paper before work starts, not solved on site by whoever is there that day.

A rollout succeeds by refusing improvisation. Every deviation from the reference unit is solved on paper, before it becomes a site decision.

05

Licensing, permits and the opening date

In Greece a food business opens under the rules for premises of health interest: an operating notification, a kitchen that meets food-hygiene (HACCP) requirements, fire-safety documentation and, where music is played, a municipal music permit; a pavement terrace needs its own permit. Each has its own paperwork and sequence, and leaving them until the build is finished routinely pushes back an opening date already agreed with a landlord or franchisor.

Your engineer or consultant files them; we prepare the drawings and specifications in parallel with construction, from the same file that goes into the build, so the inspection and the fit-out reach completion together. For a seasonal island or beach business, that parallel running is the difference between opening for the season and opening for the last weeks of it.

06 / Frequently asked

Restaurant, café & bar fit-out, answered.

What does a food business need before it opens in Greece?+

In general terms: the operating notification for premises of health interest, a kitchen that meets food-hygiene (HACCP) rules, fire-safety documentation and, if music is played, a music permit from the municipality. A pavement terrace needs its own municipal permit. Your engineer or consultant files these; we build to them and supply the drawings and specifications each file needs.

What decides the cost of a restaurant or bar fit-out?+

Mostly the kitchen: how many stations the menu needs, how long the extraction route is and whether it has to rise to the roof, and the equipment list. Then the condition of the shell, the bar joinery and the finish level of the dining room. We price each of these as its own line, so you can see where the money goes.

How long does a restaurant fit-out take?+

It depends on the kitchen, on whether the shell needs structural or façade works and on equipment lead times. We set the date backwards from your opening, order long-lead items first and run the licensing file in parallel, so the programme you sign is one that can be kept.

Our unit has never had a kitchen. Can it take one?+

That is the first thing we check in the survey. The extraction route, the gas and power supply and the drainage decide whether a full kitchen is possible; if they don't allow one, we tell you before you sign a lease or a design.

Can you open a beach bar or an island restaurant in time for the season?+

Yes, if the work starts early enough. On the islands materials and equipment travel by ferry, so we order and pack everything before the crew goes out, and plan the build backwards from your opening date.

Do you supply the kitchen equipment as well as build the space?+

Yes. Catering equipment is sourced directly from manufacturers with full warranty and installed in the same programme as the kitchen.

Can you roll out the same concept across several units?+

Yes. We build one signed reference unit, lock a specification pack against it and repeat that build at a fixed price per unit, adapting each shell on paper before work starts.

Is the price fixed before work starts?+

Yes. Once the specification is signed off you receive a fixed-price proposal, with a costed process for anything added once work is under way.

Send Us The Concept.
We will send back a working kitchen.

One restaurant, café or bar, or a brand with several units, anywhere in Greece: tell us the concept, the covers, the location and the opening date. You get a kitchen designed to pass inspection, a dining room built for service and a fixed-price specification.

Prefer to give us a call? +30 6948 408 542