MaterialsHub
ConsultingQuality Control & Factory Audits

We inspect the factory
so you never inspect a claim.

Independent quality control and factory audits for anyone buying materials, furniture or equipment at volume. We qualify the plant before you pay a deposit, inspect during production, and check every pallet before it is loaded — so what arrives in Greece is what you signed for, in the quantity you ordered, on the date you were promised.

Call NowSame-week inspections across Greece, Italy, Turkey and the Balkans
Inspector checking tile production quality inside a factory
Close inspection of finished panels before loading
On site

Close inspection of finished panels before loading

0h
From booking to inspector on site
0%
Photo and video evidence per report
0
Countries covered by our audit network
0
Claims paid on inspected shipments
Scored audit reportInspection dossierCorrective action planLoading recordScored audit reportInspection dossierCorrective action planLoading recordScored audit reportInspection dossierCorrective action planLoading record
01 / What we control

Four checkpoints between your order and your site.

01

Factory & supplier audit

Before the first order, we visit the plant and score it the way a buyer should: real production capacity versus claimed capacity, machinery age and condition, in-house testing, raw material sourcing, certification validity, labour and safety practice, and financial stability signals. You receive a scored report with the risks written plainly and a recommendation to proceed, proceed with conditions, or walk away.

  • Capacity, machinery and shift-pattern verification
  • Certification and test-report authenticity checks
  • Raw material traceability and sub-supplier mapping
  • Scored go / conditional / no-go recommendation
The economics

One inspection costs less than one rejected pallet. One factory audit costs less than one wasted season.

02 / How it runs

Booked in a day, reported in twenty-four hours.

01

Brief & checklist

You send the order, the technical sheet and the approved sample. We build a project-specific checklist with your tolerances, your critical defects and your acceptance limits — not a generic template.

03 / What you receive

Evidence you can put
in front of a supplier.

Every engagement ends with documentation that stands up in a negotiation, an insurance claim or a board review — not a verbal opinion.

01

Scored audit report

Factory capability scored across capacity, quality systems, compliance and risk, with a written recommendation.

02

Inspection dossier

Photos, video, measurements and defect classification mapped to your agreed AQL limits.

03

Corrective action plan

Defect root cause, the fix, the responsible party and the re-verification date.

04

Loading record

Carton counts, pallet condition, container number and seal, photographed at closing.

05 / The long read

Why quality fails between
the sample and the container.

Almost nobody buys a bad sample. Problems appear between the sample that was approved and the goods that were loaded, in a period when the buyer is a thousand kilometres away and the factory is optimising its own costs. This is what actually goes wrong, and how inspection is structured to catch it.

01

The approved sample is not the contract — the technical sheet is

A physical sample tells you what a factory can make once, under supervision, with its best operator and best batch of raw material. It does not tell you what the plant produces at three in the morning on the eighth day of a rush order. The contract that matters is the technical sheet: substrate, thickness, tolerance, finish reference, hardware brand and model, packaging specification, marking and test standard.

Every inspection we run measures against that sheet, not against a memory of the sample. Where a sheet does not exist, writing one is the first deliverable — because a defect you cannot define in writing is a defect you cannot reject.

A defect you cannot define in writing is a defect you cannot reject.

02

Capacity fraud is more common than quality fraud

The most damaging discovery in a factory audit is rarely a bad product. It is a plant that has quoted for volume it cannot produce and intends to subcontract the overflow quietly to a workshop you have never seen, with different machinery, different raw material and no quality system. The first order arrives perfect; the third arrives from somewhere else.

That is why an audit counts machines, measures line speed, reads maintenance logs, looks at raw material stock against the order book and asks for the names of sub-suppliers. A plant that answers those questions comfortably is usually a plant worth buying from.

Stated vs real capacity

Machine count, cycle times and shift patterns cross-checked against the order book.

Sub-supplier map

Who else touches your product, where, and under whose quality control.

Raw material stock

Whether inputs on site can physically support the promised delivery date.

Quality system

In-house testing equipment, calibration records and rejection statistics.

03

Shade, tone and batch — the defects that only appear on site

Tiles, stone, wood, laminates, paints and fabrics are all batch products. A shade difference invisible in a factory corridor becomes glaring across four hundred square metres of daylight-lit floor, and it is discovered by an installer with a deadline rather than by a buyer with options. The same applies to grain direction on timber and veneer, and to gloss level on lacquered fronts.

Inspection controls this by checking batch and calibre codes across the whole shipment, not just the sample cartons, and by physically laying out panels or tiles from different pallets under consistent light. We also verify that a single project's quantity is drawn from one production run, plus a documented overage held in reserve for cuts and future repairs.

04

Packaging is a quality specification, not a wrapper

A significant share of damage claims in the Greek market are caused by packaging that was never specified. Corner protection, pallet strapping, moisture barriers for sea freight, carton wall strength, edge protection on worktops and glass, and clear handling marks all belong in the purchase order. Without them, the factory buys the cheapest carton available.

Our pre-shipment inspection tests the packing as seriously as the product: carton compression, drop resistance on a sample, moisture readings on timber-based goods, and correct labelling in the language of the receiving warehouse. Loading is supervised so that heavy pallets are not stacked on furniture and containers are not filled beyond safe load lines.

Half of what looks like transit damage began with an unspecified carton.

05

Using inspection as commercial leverage, not just insurance

The strategic value of inspection is timing. A defect found before the balance payment is a negotiation; the same defect found after delivery is a favour you are asking for. Structuring your payment terms around an inspection milestone — deposit, inspection, balance against a passed report — changes the entire dynamic with a supplier, and costs nothing to write into the order.

Clients who run this consistently see supplier defect rates fall within two or three orders, because the factory learns that the goods will actually be examined. That behavioural change, more than any single rejected pallet, is where the return on quality control appears.

Deposit

Released on signed technical sheet and approved golden sample.

Mid-production

Inspection result triggers continue, rework or stop.

Balance

Paid against a passed pre-shipment report, not against a promise.

Arrival

Container opened with a witness report so claims are documented on day one.

06 / Frequently asked

Quality control, answered plainly.

Do you inspect factories outside Greece?+

Yes. Our audit network covers Greece, Italy, Spain, Turkey, Poland, Germany, China, India and Vietnam — the sourcing corridors that supply most of the Greek construction and furniture market.

Can you inspect a supplier we already work with?+

Frequently, that is exactly why clients call. An existing supplier with rising defect rates or slipping lead times is audited the same way as a new one, and the report gives you a factual basis for the conversation instead of a complaint.

What is AQL sampling and which level should we use?+

AQL defines how many units are sampled and how many defects are acceptable at critical, major and minor levels. For finished interior products we usually set 0 / 2.5 / 4.0, and we agree the levels with you in writing before the first inspection.

How quickly can you get someone to a factory?+

Within 48 hours in Greece and most of Europe, and typically within five working days in Asia, subject to the factory confirming access.

Do you also handle the commercial negotiation?+

We deliver the technical facts and the leverage; if you want us to run the discussion with the supplier, our procurement consultants can take it from there under a separate scope.

Stop paying for
someone else's mistakes.

Send us the order you are least comfortable with. We will tell you what we would check, what it costs and how fast we can be on site.

Athens / Thessaloniki / Nationwide