MaterialsHub
Residential & contract

FurnitureImported & distributed

Sofas, beds, dining, wardrobes, outdoor and hotel FF&E, quoted as one package.

Residential furniture for homes under construction or renovation, and full FF&E packages for hotels and rental units — sofas and armchairs, beds and mattresses, dining and living pieces, wardrobes and storage, plus outdoor furniture that survives a terrace. We work from the floor plan and the finish schedule, so every piece arrives sized for the room and matched to the palette already specified elsewhere in the project.

Importer & distributorLead time 3–8 wks
Warm minimal living room with a tailored sofa, coffee table and layered furniture
FurnitureResidential & contract
Delivered in
0–8 weeks depending on fabric and finish
You get
Furniture matched to your floor plan and existing palette
Backed by
Contract-grade frames and FR-rated fabrics for hospitality
We handle
Room-by-room take-off, quantities and delivery scheduling
Apartments and housesHotels and guesthousesShort-term rental unitsTerraces and pool areasOffices and reception areasApartments and housesHotels and guesthousesShort-term rental unitsTerraces and pool areasOffices and reception areasApartments and housesHotels and guesthousesShort-term rental unitsTerraces and pool areasOffices and reception areas
00 / The brief

A furniture order is a logistics job before it's a design job.

The piece in the showroom always looks right. What goes wrong is the access route, the finish that reads differently under site lighting, and the twelve-week lead time nobody flagged until the fit-out was already booked. We quote furniture the way a contractor needs it quoted: with a real lead time, a confirmed finish sample, and a delivery sequence that matches your build programme.

Warm minimal living room with a tailored sofa, coffee table and layered furniture
3–8 wks

Furniture doesn't fail on the showroom floor. It fails on delivery day, when the sofa doesn't fit the lift and the finish doesn't match the sample.

Residential clients get pieces matched to their joinery and lighting plan rather than picked in isolation. Hotels, offices and restaurants get a full FF&E schedule — one document listing every chair, table and banquette by room, with contract-grade upholstery and fire-rated foam specified from day one, not discovered at the certification stage.

1
Order covers residential and contract pieces
4–10 wks
Lead time on made-to-order runs
FF&E
Full schedules quoted for hotels & offices
1
Finish sample pack per project
01 / Why through us

We import the furniture. The agent runs the project.

One supplier quotes the whole schedule — sofas, tables, joinery and contract seating — against a single finish and delivery plan, instead of five invoices that arrive on five different weeks.

01 / 04

Furnished from the plan, not the showroom

We take the floor plan and clearance dimensions before proposing pieces, so nothing arrives too deep for the corridor or too wide for the bay.

Every piece checked against room dimensions

02 / 04

One palette across the whole property

Fabric, timber tone and metal finish are matched to the flooring and joinery already specified, so rooms read as one project.

Finish matched to the existing spec

03 / 04

Hotel quantities, hotel durability

Contract-grade frames, fire-rated foams and commercial fabrics for units that turn over guests every few days.

Contract-grade FR fabrics and frames

04 / 04

One PO for the whole apartment or unit

Sofas, beds, dining and storage land against a single purchase order and a single delivery programme per unit or floor.

One PO, one delivery date, per unit

02 / The range

What we carry in furniture

06The rangeLead time 3–8 wks
01

Sofas & seating

Modular and fixed sofas, armchairs and occasional seating in fabric, leather and performance textiles

Indicative supply range
€150–€2500 /unit
3–8 wks
02

Beds & mattresses

Upholstered and timber bed frames, hotel-grade mattresses and headboards in project quantities

Indicative supply range
€150–€2500 /unit
3–8 wks
03

Dining & living

Tables, chairs, sideboards and coffee tables in solid wood, veneer and lacquer

Indicative supply range
€150–€2500 /unit
3–8 wks
04

Wardrobes & storage

Fitted and freestanding wardrobes, chests and hallway storage sized to the room

Indicative supply range
€150–€2500 /unit
3–8 wks
05

Outdoor furniture

Weatherproof lounge, dining and sunbed sets for terraces, pools and hotel gardens

Indicative supply range
€150–€2500 /unit
3–8 wks
06

Hotel & rental FF&E

Full room packages — case goods, soft seating, headboards and outdoor — specified per key

Indicative supply range
€150–€2500 /unit
3–8 wks
03 / Where it goes

The same material, specified differently per space.

Living & dining
01

Living & dining

Sofas, dining tables and storage pieces are checked against your room dimensions and access route before ordering, with fabric and timber samples matched to your flooring and joinery so nothing arrives looking like an afterthought.

Access route checked before ordering
Hotels & hospitality
02

Hotels & hospitality

Guest room case goods, lobby seating and restaurant chairs are scheduled as one document with fire-rated foam and commercial-grade frames, so certification and reordering damaged pieces in year three are both straightforward.

Fire-rated foam and contract fabric as standard
Offices & workplace
03

Offices & workplace

Workstations, task chairs and breakout furniture are specified for daily use rather than showroom appearance, with ergonomic certification available for procurement files and volume pricing on repeat desk runs.

Ergonomic task seating with certification on file
Restaurants & retail
04

Restaurants & retail

Upholstery, frames and table tops are specified for wipe-down cleaning and heavy nightly use, with matching spare fabric kept on file so a torn banquette seat is a repair, not a full replacement.

Wipe-clean, commercial-grade upholstery
Residential & contract

Sofas,beds,dining,wardrobes,outdoorandhotelFF&E,quotedasonepackage.

04 / How to specify it

The decisions that decide the result.

01 / 06

Confirm the access route before you order

Lift size, stairwell width and door openings decide whether a sofa arrives whole or has to be reordered in a knock-down frame — we check this before confirming the order, not on delivery day.

02 / 06

Fix the finish with a physical sample

Screen colours shift; a physical swatch against your actual flooring and paint is what we sign off before production starts.

03 / 06

Separate stock items from made-to-order

Stock pieces ship in days; upholstered and joinery-matched pieces run 4–10 weeks — we flag which is which at quote stage so your programme isn't guessing.

04 / 06

Specify contract-grade for any commercial project

Domestic furniture doesn't carry fire ratings hotels and restaurants need — contract-grade frames and foam are non-negotiable for licensing.

05 / 06

Schedule delivery around the fit-out, not the factory

We sequence delivery to arrive after flooring and paint but before the final clean, so nothing gets damaged mid-build.

06 / 06

Hold spare fabric and finish from the same batch

A repair three years later needs to match, not just resemble — we keep a note of your batch against future reorders.

Common mistakes

Ordering from a screen colour alone

What looks warm oak on a monitor can read distinctly orange under site lighting — a physical sample avoids the surprise.

Ignoring the delivery route

A sofa that doesn't fit round a stairwell turn gets returned to the warehouse, at cost and delay — we check dimensions against access before ordering.

Specifying domestic furniture for a commercial project

Hotels and restaurants need fire-rated foam and contract fabric — domestic-grade pieces can stall a licensing inspection.

Terms, plainly
FF&E
Furniture, Fixtures & Equipment — the full schedule of movable furniture and fittings for a commercial project.
Contract-grade upholstery
Fabric and foam tested and rated for commercial fire safety and heavy daily use.
Knock-down (KD) frame
Furniture built to be assembled on site, used where access routes are too tight for a fully built piece.
05 / Catalog Materials Snapshot

A snapshot of the furniture we move most.

Representative selections from the catalog — indicative of what we quote, stock-source and deliver week to week. Ask for the full schedule with formats, finishes and current lead times.

Sofas & seating — Warm minimal living room with a tailored sofa, coffee table and layered furniture
01

Sofas & seating

Modular and fixed sofas, armchairs and occasional seating in fabric, leather and performance textiles

Indicative supply range
€150–€2500 /unit
Beds & mattresses — Warm minimal living room with a tailored sofa, coffee table and layered furniture
02

Beds & mattresses

Upholstered and timber bed frames, hotel-grade mattresses and headboards in project quantities

Indicative supply range
€150–€2500 /unit
Dining & living — Warm minimal living room with a tailored sofa, coffee table and layered furniture
03

Dining & living

Tables, chairs, sideboards and coffee tables in solid wood, veneer and lacquer

Indicative supply range
€150–€2500 /unit
Wardrobes & storage — Warm minimal living room with a tailored sofa, coffee table and layered furniture
04

Wardrobes & storage

Fitted and freestanding wardrobes, chests and hallway storage sized to the room

Indicative supply range
€150–€2500 /unit
Prefer to give us a call?Call Now +306948408542
06 / The long read

Furniture, from first quote
to a finished room.

One supplier quotes the whole schedule — sofas, tables, joinery and contract seating — against a single finish and delivery plan, instead of five invoices that arrive on five different weeks. This is the part most suppliers leave out: what we import, how furniture should be specified before anyone prices it, where projects lose money, and what our 3–8 wks lead time actually covers.

01

What we import, and what lands on site

Residential furniture for homes under construction or renovation, and full FF&E packages for hotels and rental units — sofas and armchairs, beds and mattresses, dining and living pieces, wardrobes and storage, plus outdoor furniture that survives a terrace. We work from the floor plan and the finish schedule, so every piece arrives sized for the room and matched to the palette already specified elsewhere in the project.

Because we buy furniture directly from the factories, the range you see is the range we can programme — not a catalogue we hope to source later. In practice that means sofas & seating, beds & mattresses and dining & living, each with its own price band and availability, so a specification can be tuned to a budget instead of abandoned.

Furnished from the plan, not the showroom: we take the floor plan and clearance dimensions before proposing pieces, so nothing arrives too deep for the corridor or too wide for the bay.

Furniture doesn't fail on the showroom floor. It fails on delivery day, when the sofa doesn't fit the lift and the finish doesn't match the sample.

Furnished from the plan, not the showroom

We take the floor plan and clearance dimensions before proposing pieces, so nothing arrives too deep for the corridor or too wide for the bay.

One palette across the whole property

Fabric, timber tone and metal finish are matched to the flooring and joinery already specified, so rooms read as one project.

Hotel quantities, hotel durability

Contract-grade frames, fire-rated foams and commercial fabrics for units that turn over guests every few days.

One PO for the whole apartment or unit

Sofas, beds, dining and storage land against a single purchase order and a single delivery programme per unit or floor.

02

How furniture should be specified before it is priced

Specifying furniture well comes down to a short list of decisions taken in the right order — confirm the access route before you order, fix the finish with a physical sample, separate stock items from made-to-order and specify contract-grade for any commercial project. Taken on paper, these cost nothing. Taken on site, each one is a change order.

We write the specification with you before anything is quoted, so the number you get is for the material that will actually be installed. That means confirmed dimensions and finishes, the right performance class for the space, and quantities that include the waste factor rather than discovering it mid-installation.

The same reference behaves differently depending on where it goes — apartments and houses, hotels and guesthouses, short-term rental units and terraces and pool areas each carry their own requirements, and we specify against the space rather than against a mood image.

FF&E

Furniture, Fixtures & Equipment — the full schedule of movable furniture and fittings for a commercial project.

Contract-grade upholstery

Fabric and foam tested and rated for commercial fire safety and heavy daily use.

Knock-down (KD) frame

Furniture built to be assembled on site, used where access routes are too tight for a fully built piece.

Case goods

Hard furniture such as wardrobes, desks and cabinets, as distinct from upholstered seating.

03

Where furniture projects lose time and money

Almost every delay we are called in to rescue traces back to the same handful of causes: ordering from a screen colour alone, ignoring the delivery route, specifying domestic furniture for a commercial project and booking a tight lead time on a made-to-order piece. None of them are exotic, and all of them are avoidable at specification stage.

Ordering from a screen colour alone is the most expensive one, because what looks warm oak on a monitor can read distinctly orange under site lighting — a physical sample avoids the surprise.

We have supplied furniture into living & dining, hotels & hospitality and offices & workplace, and the pattern is consistent: the projects that run smoothly are the ones where the material was locked before the trades were booked.

Ignoring the delivery route — checked once on paper, never again on site.

Ordering from a screen colour alone

What looks warm oak on a monitor can read distinctly orange under site lighting — a physical sample avoids the surprise.

Ignoring the delivery route

A sofa that doesn't fit round a stairwell turn gets returned to the warehouse, at cost and delay — we check dimensions against access before ordering.

Specifying domestic furniture for a commercial project

Hotels and restaurants need fire-rated foam and contract fabric — domestic-grade pieces can stall a licensing inspection.

Booking a tight lead time on a made-to-order piece

Upholstered and bespoke joinery pieces run weeks, not days — we flag the real lead time before your programme is locked.

04

Lead times, pricing and what we handle

Standard lead time on furniture is 3–8 wks from confirmed specification, and that window covers the whole chain — factory programming, consolidation, transport, customs where applicable and delivery to site or to your warehouse. We quote the landed number, not an ex-works price that grows later.

Pricing is per project rather than per line. Because we import directly and consolidate furniture with the rest of the materials for the same room, you get one quote, one delivery window and one point of contact — and the savings show up on the total, not just on a headline reference.

If you already have drawings, send them and we will come back with a specification and a landed price. If you do not, we will build the specification with you first. Either way, nothing is ordered until the quantities, finishes and dates are agreed in writing.

07 / Questions

Frequently asked

Can you furnish a whole apartment from one order?+

Yes. Send the floor plan and we return a room-by-room proposal — living, bedrooms, dining and outdoor — priced as one package with one delivery date per unit.

Do you supply furniture for hotels and rental portfolios?+

Yes, including contract-grade frames, fire-rated fabrics and mattresses that meet hospitality standards, specified per key and delivered in phased batches as rooms are ready.

How long does furniture take to arrive?+

Stocked lines ship in 2–3 weeks; upholstery in a specific fabric or a made-to-order case good runs 5–8 weeks. We confirm the real date at order, not at enquiry.

Can you match new furniture to flooring and joinery already installed?+

Yes, send photos or the finish schedule and we select timber tones, metal finishes and fabrics that sit correctly against what is already specified.

Is outdoor furniture actually weatherproof for a Greek terrace?+

We specify UV-stable resin weave, powder-coated aluminium and quick-dry foams rated for sun and salt air, not indoor pieces relabelled for outdoor use.

Do you handle assembly and placement on site?+

We coordinate delivery to site or to the unit door; assembly and placement are arranged with vetted crews where you don't already have one.